Other
You will need to construct three line graphs using three of the SSRDs listed below:
1. You will need to construct three line graphs using three of the SSRDs listed below:
a. Three Phase Alternating Treatment Design (ATD)
b. Changing Criterion Design (CCD)
c. Multiple Baseline Design (MBL)
2. You will use the same baseline data from reliability activity and generate additional mock
treatment data to depict functional relationship across each of the designs. This often means at
least 5 data points per condition (more if you do not have stable data).